Kitchen Progress

Kitchen Progress

It’s been a little over 7 weeks since the kitchen remodel has started and the last two weeks there has been a lot of progress.  The beam is up (the wall isn’t out yet), the floor is all pulled up, and the framing is installed.  Luckily Steve doesn’t start work until next week because he’s been really involved with planning.  The kitchen is going to look incredible.  We can’t wait!  Here’s some pictures

I took them with our fisheye to get the whole thing in view (I need to buy a wide angel lense), makes it look like our kitchen is shaped like a wine barrel